Aeronautical Terms beginning with G

GA CDR

General Aviation Coded Departure Routes (GA CDR) - The CDR program provides a rapid means to reroute aircraft when the filed route is constrained by either weather or congestion. Historically, abbreviated CDR clearances have only been issued to airline customers who have signed a Memorandum of Agreement (MOA) with the facilities that issue abbreviated CDR clearances. Recently, general aviation customers have requested the use of this reroute capability. This change permits general aviation customers to communicate to Air Traffic Control (ATC) facilities their ability and willingness to accept CDRs and their capability to accept abbreviated clearances associated with CDRs. Please see the GA CDR Advisory circular for more details.


GDP

Ground Delay Program. Ground Delay Programs are implemented to control air traffic volume to airports where the projected traffic demand is expected to exceed the airport´s acceptance rate for a lengthy period of time. Lengthy periods of demand exceeding acceptance rate are normally a result of the airport´s acceptance rate being reduced for some reason. The most common reason for a reduction in acceptance rate is adverse weather such as low ceilings and visibility.
How it works: Flights that are destined to the affected airport are issued Expect Departure Clearance Times (EDCT) at their point of departure. Flights that have been issued EDCTs are not permitted to depart until their Expect Departure Clearance Time. These ECDTs are calculated in such a way as to meter the rate that traffic arrives at the affected airport; ensuring that demand is equal to acceptance rate. The length of delays that result from the implementation of a Ground Delay Program is a factor of two things; how much greater than the acceptance rate the original demand was, and for what length of time the original demand was expected to exceed the acceptance rate.


GPS

Global Positioning System


GS

Ground Stop. Ground Stops are implemented for a number of reasons. The most common reasons are:
To control air traffic volume to airports when the projected traffic demand is expected to exceed the airport´s acceptance rate for a short period of time.
To temporarily stop traffic allowing for the implementation of a longer-term solution, such as a Ground Delay Program.
The affected airport´s acceptance rate has been reduced to zero.
How it works: Flights that are destined to the affected airport are held at their departure point for the duration of the Ground Stop.



Copyright © 2002-2026 Touring Machine Company. All Rights Reserved.